Skip to content

Template: Risk Register ​

Instructions ​

The risk register records all information security risks of BAUER GROUP under §30(2) No. 1 BSIG. It is the foundation for risk analysis and the ISMS.

Risk Entry ​

markdown
## Risk Entry

| Field | Value |
|---|---|
| **Risk ID** | RISK-NIS2-XXXX |
| **Short title** | [Risk name] |
| **Description** | [Risk description with threat, vulnerability, impact] |
| **Asset category** | [Data / System / Process / Personnel / Supplier] |
| **Affected protection goals** | [ ] Availability  [ ] Integrity  [ ] Confidentiality  [ ] Authenticity |
| **Likelihood** | [Very low / Low / Medium / High / Very high] |
| **Impact** | [Very low / Low / Medium / High / Very high] |
| **Gross risk level** | [Low / Medium / High / Critical] |
| **Existing controls** | [List with reference to documentation] |
| **Control effectiveness** | [High / Medium / Low] |
| **Net risk level** | [Low / Medium / High / Critical] |
| **Risk treatment** | [Avoid / Mitigate / Transfer / Accept] |
| **Planned actions** | [Description + target date] |
| **Owner** | [Name / role] |
| **Initial assessment** | [Date] |
| **Last review** | [Date] |
| **Next review** | [Date, max. +12 months] |
| **§30 reference** | [No. 1–10] |
| **Notes** | [Free text, e.g. assumptions, external factors] |

Assessment Matrix ​

Likelihood × ImpactVery lowLowMediumHighVery high
Very highMediumHighHighCriticalCritical
HighMediumMediumHighHighCritical
MediumLowMediumMediumHighHigh
LowLowLowMediumMediumHigh
Very lowLowLowLowMediumMedium

Notes ​

  • ID format: RISK-NIS2-XXXX (sequentially numbered)
  • Critical risks are reported to management immediately (§38)
  • High risks appear in the quarterly report
  • Risk acceptance requires documented justification and management approval
  • The register is fully reviewed at least annually

Documentation licensed under CC BY-NC 4.0 · Code licensed under MIT